Items where Division is "Faculty of Engineering > Civil Engineering Study Program" and Year is 2018

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 52.

Akbar, Taufik (2018) Kajian dampak lalu lintas terhadap kinerja jalan. Other thesis, Wijaya Kusuma Surabaya University.

Andrean, Achmad Aldyno (2018) Evaluasi penerapan sistem keselamatan dan kesehatan kerja (SMK3) pada proyek pembangunan jalan tol (studi kasus proyek jalan tol Krian-Legundi-Bunder-Manyar PT.Waskita Beton Precast (Persero) TBK). Other thesis, Wijaya Kusuma Surabaya University.

Darmawan, . (2018) Cost significant model sebagai dasar pemodelan estimasi biaya proyek box culvert di Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Debora, Diana (2018) Analisa perkuatan embankment di atas tanah lunak (studi kasus perumahan Pakuwon city Surabaya). Other thesis, Wijaya Kusuma Surabaya University.

Dumawa, Andika Gayung (2018) Perencanaan pelebaran dan anggaran biaya ruas jalan Bulu (batas Provinsi Jawa Tengah) Tuban km.sby 118+00 sampai dengan km.sby 121+711 menggunakan perkerasan lentur. Other thesis, Wijaya Kusuma Surabaya University.

Ermawan, Nurani (2018) Analisa kepuasan owner terhadap kontraktor pada konstruksi swasta di kota Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Hendrawan, . (2018) Analisa kepuasan pemilik proyek perumahan terhadap kualitas pelayanan kontraktor di kota Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Hendrawan, . (2018) Analisa kepuasan pemilik proyek perumahan terhadap kualitas pelayanan kontraktor di kota Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Hubert, Willy (2018) Analisa faktor risiko biaya pada pembangunan perumahan type Vicenze The Greenlake Citraland. Other thesis, Wijaya Kusuma Surabaya University.

Huda, Miftahul (2018) Analysis of Contractor Satisfaction to Performance of The Government Project Owner. India. (Submitted)

Huda, Miftahul (2018) Analysis of Contractor Satisfaction to Performance of The Government Project Owner. IJESRT International Journal of Engineering sciences & Reseach Technology, 7 (2). 750 -757. ISSN ISSN: 2277-9655

Huda, Miftahul (2018) Analysis of Deflection and Moment Capacity on the Precast Beam of the Nk-Spircon Connecting System. Publisher of International Academic Journals, UTM. Johor, Malaysia. (Unpublished)

Huda, Miftahul (2018) Analysis of Deflection and Moment Capacity on the Precast Beam of the Nk-Spircon Connecting System. Publisher of International Academic Journals, UTM. Johor, Malaysia. (Submitted)

Huda, Miftahul (2018) Analysis of Deflection and Moment Capacity on the Precast Beam of the Nk-Spircon Connecting System. International Journal of Engineering & Technology, 7 (3.25). pp. 458-462. ISSN ISSN: 2227-524X

Huda, Miftahul (2018) Cost Estimate Modelling of Prestressed Concrete Bridge at the Public Works and Housing Department of Bina Marga East Java Province Indonesia. Publisher of International Academic Journals,. (Unpublished)

Huda, Miftahul (2018) Cost Estimate Modelling of Prestressed Concrete Bridge at the Public Works and Housing Department of Bina Marga East Java Province Indonesia. Publisher of International Academic Journals. (Submitted)

Huda, Miftahul (2018) Cost Estimate Modelling of Prestressed Concrete Bridge at the Public Works and Housing Department of Bina Marga East Java Province Indonesia. International Journal of Engineering and Technology, 9 (6). pp. 4543-4550. ISSN e-ISSN : 0975-4024 p-ISSN : 2319-8613

Huda, Miftahul (2018) The Effect of Project Performance to Satisfaction of The Project Owner. Publisher of International Academic Journals. (Unpublished)

Huda, Miftahul (2018) The Effect of Project Performance to Satisfaction of The Project Owner. Publisher of International Academic Journals. (Submitted)

Huda, Miftahul (2018) The Effect of Project Performance to Satisfaction of The Project Owner. International Journal of Engineering and Technology, 9 (6). pp. 4374-4379. ISSN e-ISSN : 0975-4024 p-ISSN : 2319-8613

Huda, Miftahul (2018) THE IMPACT OF THE COMPANY'S ENVIRONMENT TO PERFORMANCE AND COMPETITIVENESS OF INDONESIAN CONSTRUCTION COMPANIES. IAEME Publication -India,. (Unpublished)

Huda, Miftahul (2018) THE IMPACT OF THE COMPANY'S ENVIRONMENT TO PERFORMANCE AND COMPETITIVENESS OF INDONESIAN CONSTRUCTION COMPANIES. IAEME Publication -India. (Submitted)

Huda, Miftahul (2018) THE IMPACT OF THE COMPANY'S ENVIRONMENT TO PERFORMANCE AND COMPETITIVENESS OF INDONESIAN CONSTRUCTION COMPANIES. International Journal of Civil Engineering and Technology (IJCIET)., 9 (8). 1221- 1232. ISSN ISSN Print: 0976- 6308 ISSN Online: 0976-6316

Huda, Miftahul (2018) IMPLEMENTATION OF PMBOK 5TH STANDARD TO IMPROVE THE PERFORMANCE AND COMPETITIVENESS OF CONTRACTOR COMPANIES. IAEME Publication -India. (Unpublished)

Huda, Miftahul (2018) IMPLEMENTATION OF PMBOK 5TH STANDARD TO IMPROVE THE PERFORMANCE AND COMPETITIVENESS OF CONTRACTOR COMPANIES. IAEME Publication. (Submitted)

Huda, Miftahul (2018) IMPLEMENTATION OF PMBOK 5TH STANDARD TO IMPROVE THE PERFORMANCE AND COMPETITIVENESS OF CONTRACTOR COMPANIES. International Journal of Civil Engineering and Technology (IJCIET)., 9 (6). 1256- 1266. ISSN ISSN Print: 0976- 6308 ISSN Online: 0976-6316

Huda, Miftahul (2018) Preleminary Cost Estimate Model for Maintenance and Improvement of Road Project. The International Journal of Engineering and Science (The IJES)., 7 (2). pp. 41-49. ISSN ISSN (e): 2319-1813, ISSN (p): 2319-1825

Huda, Miftahul (2018) Preleminary Cost Estimate Model for Maintenance and Improvement of Road Project. The International Journal of Engineering and Science (IJES). (Unpublished)

Jainudin, Jainudin. (2018) Penyediaan fasilitas lahan parkir pada sebuah gedung (studi kasus Universitas Ciputra Surabaya). Other thesis, Wiajaya Kusuma Suarabaya University.

Kayame, Selfina Sarah (2018) Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan pada Proyek Konstruksi (Studi Kasus: Pembangunan Proyek Gedung di Surabaya). Other thesis, Wijaya Kusuma Surabaya.

Kurniawan, Dani (2018) Analisa tingkat kepuasan pengguna commuter line sebagai transportasi publik di kota Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Kurniawan, Dicky (2018) Analisis faktor-faktor efektivitas yang mempengaruhi tingkat produksi alat berat pada pekerjaan cut and fill (Study kasus proyek GEM City. AKR Land, Manyar, Gresik). Other thesis, Wijaya Kusuma Surabaya University.

Kusuma, Happy Anggar (2018) Perencanaan struktur gedung kampus HNK menggunakan sistem ganda. Other thesis, Wijaya Kusuma Surabaya University.

Maliki, Akhmad (2018) Pembuatan Simulasi/Program Granulasi Tanah Berbutir Halus Menjadi Tanah Berbutir Kasar Dengan Menggunakan Program Matlab. Universitas Madura. (Unpublished)

Maliki, Akhmad (2018) Pembuatan Simulasi/Program Granulasi Tanah Berbutir Halus Menjadi Tanah Berbutir Kasar Dengan Menggunakan Program Matlab. Universitas Madura. (Unpublished)

Maliki, Akhmad (2018) Pembuatan Simulasi/Program Granulasi Tanah Berbutir Halus Menjadi Tanah Berbutir Kasar Dengan Menggunakan Program Matlab. Universitas Madura. (Unpublished)

Muhammad, Thibby (2018) Optimalisasi produktivitas alat berat pada pekerjaan tanah (studi kasus proyek penimbunan area jalan Cluster Grand Estate Marina City AKR Manyar Gresik). Other thesis, wijaya kusuma surabaya university.

Mustofa, Rizal (2018) Studi Kelayakan Pembangunan Apartemen Biz Square Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Nashor,, Muh. Fajar Zulqurnia (2018) Perencanaan struktur gedung kampus FJR menggunakan sistem ganda di kota Palu. Other thesis, Wijaya Kusuma Surabaya University.

Permadi, Dwi (2018) Analisa risiko aspek biaya pekerjaan saluran box culvert (Studi kasus jalan Kenjeran dan Tenggumung Kota Surabaya). Other thesis, Wijaya Kusuma Surabaya University.

Putra, Tanjung Junia Anggara (2018) Evaluasi kompetensi mata kuliah manajemen proyek konstruksi pada program studi teknik sipil (studi kasus di Surabaya). Other thesis, Wiajaya Kusuma Suarabaya University.

Retmono, Erza Putra (2018) Penerapan sistem pemanenan air hujan untuk mengatasi kekeringan dan penyediaan air bersih di desa banter (Gresik). Other thesis, Wijaya Kusuma Surabaya University.

Riyadi, Kharisman Noor (2018) Evaluasi simpang bersinyal pada persimpangan kawasan tambak Osowilangon Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Soma, Mailla Bardiyanti (2018) Perencanaan gedung struktur baja tahan gempa menggunakan sistem rangka Bresing Eksentris (Link Beam) dengan Bresing X-2. Other thesis, Wijaya Kusuma Surabaya University.

Suwantoro, Faris (2018) Faktor-faktor yang mempengaruhi terjadinya limbah pada proyek Hotel Howard Johnson Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Syahroni, Muhammad (2018) Analisis kepuasan owner terhadap kinerja kontraktor di Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Lumajang. Other thesis, Wijaya Kusuma Surabaya University.

Utomo, Septyan Widianto (2018) Perencanaan Gedung Serbaguna Di Kota Surabaya Menggunakan Beton Prategang Dan Konvensional Metode Sistem Rangka Pemikul Momen Khusus. Other thesis, Wijaya Kusuma Surabaya University.

Widianto, Totok (2018) Analisa risiko proyek pembangunan Universitas Ciputra tahap 4. Other thesis, Wijaya Kusuma Surabaya University.

Wijaya, Endra (2018) Analisa risiko dan mitigasi risiko pembangunan jalan tol Ngawi – Kertosono STA 177+100 S/d STA 178+340. Other thesis, Wijaya Kusuma Surabaya University.

Wijaya, Rudi (2018) Analisa faktor-faktor yang mempengaruhi keselamatan kerja karyawan perusahaan kontraktor di Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Wijaya, Rudi (2018) Analisa faktorfFaktor yang mempengaruhi keselamatan kerja karyawan perusahaan kontraktor di Surabaya. Other thesis, Wijaya Kusuma Surabaya University.

Windyastari, Selviana (2018) Pengaruh Kualitas Jasa Terhadap Kepuasan Penumpang Pesawat Terbang Di Bandara Syamsudin Noor Banjarmasin. Other thesis, Wijaya Kusuma Surabaya University.

This list was generated on Sat Dec 21 22:59:32 2024 WIB.