Puspitasari, Diana Implementasi Value Stream Mapping untuk Pertimbangan Desain Ulang Tata Letak Fasilitas Produksi. LPPM Universitas Trunojoyo Madura. (Unpublished)
Text
5b.2 Implementasi Value Stream Mapping untuk Pertimbangan Desain Ulang Tata Letak Fasilitas Produksi.pdf Download (3MB) |
Abstract
Lay out as a part of production facility problem have to made good design. Good design of lay out production facility will be support good efficiency .production. Base on that problem, this research aim to redesign lay out (relayout) production facility to make good efficiency production. Relayout production facility can be use Value Stream Mapping Tools. Based on analisis by using Value Stream Mapping Tools can be reduced total cycle time from 1022 minutes become 917 minutes, reduce distance of material handling. Implementation of relayout will give good efficinecy production. Keyword: relayout, Value Stream Mapping Tools.
Item Type: | Other |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Engineering > Agro-industrial Technology Study Program |
Depositing User: | Sulimin BP3 |
Date Deposited: | 19 Dec 2023 01:17 |
Last Modified: | 19 Dec 2023 01:17 |
URI: | http://erepository.uwks.ac.id/id/eprint/16780 |
Actions (login required)
View Item |
Downloads
Downloads per month over past year