Huda, Miftahul (2017) Dynamic model: The influence of project management competencies, resources and capabilities towards the performance of small-medium qualification contractor in Indonesia. IJET (International Journal of Engineering and Technology), 9 (5). pp. 3716-3725. ISSN e-ISSN : 0975-4024 p-ISSN : 2319-8613
Text
6. Dynamic model The influence of project management competencies.pdf Download (940kB) |
Abstract
he previous researchers have proven that there is a positive and significant influence between the project management competency and corporation’s resource or capability towards the performance using the static model. The purpose of this research is to develop the model and to simulate the relationship among project management competency, resource and capability, and the performance of small-medium qualification contractor in Indonesia using the dynamic model. There are four steps used in this research, developing the conceptual model, collecting the data through questionnaire and interview, developing the causal pie chart, developing the flow chart, simulating and analyzing the developing result. The research result shows that, through the development of dynamic model, the project management competency and corporation’s resource and capability in particular time frame can influence the performance of small-medium qualification contractor significantly. Keywords : competence, performance, resource, small-medium contractor, dynamic system.
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Civil Engineering Study Program |
Depositing User: | Sulimin BP3 |
Date Deposited: | 09 May 2019 23:37 |
Last Modified: | 09 May 2019 23:37 |
URI: | http://erepository.uwks.ac.id/id/eprint/3898 |
Actions (login required)
View Item |
Downloads
Downloads per month over past year