IMPLEMENTATION OF PMBOK 5TH STANDARD TO IMPROVE THE PERFORMANCE AND COMPETITIVENESS OF CONTRACTOR COMPANIES.

Huda, Miftahul (2018) IMPLEMENTATION OF PMBOK 5TH STANDARD TO IMPROVE THE PERFORMANCE AND COMPETITIVENESS OF CONTRACTOR COMPANIES. IAEME Publication. (Submitted)

[img] Text
11. REVIEWER 1 & 2.pdf

Download (256kB)
Item Type: Other
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Civil Engineering Study Program
Depositing User: Sulimin BP3
Date Deposited: 09 May 2019 23:50
Last Modified: 09 May 2019 23:50
URI: http://erepository.uwks.ac.id/id/eprint/3864

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year