Studi Kelayakan Pembangunan Flyover pada Persimpangan Bulak Kapal Bekasi Timur, Kota Bekasi, Jawa Barat.

Fahmi, Muhammad Dzul (2022) Studi Kelayakan Pembangunan Flyover pada Persimpangan Bulak Kapal Bekasi Timur, Kota Bekasi, Jawa Barat. Bachelor (S1) thesis, Wijaya Kusuma Surabaya University.

[img] Text
ABSTRAK.pdf

Download (251kB)
[img] Text
Plagiasi Presentase.pdf

Download (21kB)
Official URL: https://www.uwks.ac.id

Abstract

Abstract Bekasi City is an area which is included in the largest Industrial Estate in Indonesia, congestion is also a problem that often occurs in Bekasi City, especially at the Bulak Kapal Intersection. The road transportation network is an inseparable part of the development of bekasi city. The district's internal system approach hints that the road transportation network as a medium in organizing the movement of people, goods, and even services is very influential in supporting activities. This final project will analyze the feasibility of the construction of a flyover at the Bulak Kapal Intersection in Bekasi City, West Java. The analysis that will be calculated includes the level of traffic volume, the level of vehicle capacity on the Bulak Kapal intersection road section, the analysis of the road performance level in the form of a Degree of Saturation (DS), the analysis of the calculation of Vehicle Operating Costs (BOK), the analysis of benefit cost ratio (BCR) and the analysis of Net Present Value (NPV). In this Final Project in the existing conditions of 2018 the DS value is 1.33 > 1 during the afternoon rush hour 16.00 - 17.00 and DS 1.04 > 1 during the morning rush hour 06.00 - 07.00, then the road performance is barely functioning properly. If viewed from the results of calculations and analysis, it can be concluded that the construction of a flyover at the Bulak Kapal Intersection is feasible in terms of traffic. The economic feasibility analysis of the flyover will be determined based on the value of the ratio of benefit and cost. The benefits calculated are BOK savings and time value, the BOK value is calculated based on Jasa Marga's method. Obtained a BCR value of 1.960 > 1 and NPV of Rp 6,784,660,602.07 > 0 this indicates that the project meets the economic feasibility requirements.

Item Type: Thesis (Bachelor (S1))
Uncontrolled Keywords: Keywords : feasibility study, analysis of economy, flyover of Bulak Kapal Acces Road,road analysis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Engineering > Civil Engineering Study Program
Depositing User: Zul Fahmi ijul1303 Dzul Fahmi
Date Deposited: 07 Oct 2022 03:36
Last Modified: 07 Oct 2022 03:36
URI: http://erepository.uwks.ac.id/id/eprint/12786

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year